Prioritize the inspection of public housing properties that were (1) not included in the NSPIRE demonstration but were identified as high priority under the Center’s Big Inspection Plan and (2) approved to participate under the NSPIRE demonstration that the Center was unable to inspect by March 31, 2023.
2023-CH-0003 | May 23, 2023
Improvements Are Needed To Ensure That Public Housing Properties Are Inspected in a Timely Manner
Public and Indian Housing
- Status2023-CH-0003-001-AOpenClosed
- Status2023-CH-0003-001-BOpenClosedPriorityPriority
We believe these open recommendations, if implemented, will have the greatest impact on helping HUD achieve its mission to create strong, sustainable, inclusive communities and quality affordable homes for all.
Implement adequate policies, procedures, and controls to ensure that public housing properties will be inspected within required timeframes.
Status
NSPIRE regulations clarified and modified the timing for which inspections should occur. The date for inspection of each public housing property must then be programmed into HUD's system to ensure that inspections occur within the required timeframes. The Real Estate Assessment Center (REAC) continues to work with its management and system support contractors on the list of public housing properties to inspect and the date the inspections should be completed under the new NSPIRE regulations. REAC is in the process of adjusting the list based on information relating to small, rural public housing. As of November 2024, the NSPIRE regulations on inspection timing are completed. However, REAC is not able to make the required modifications in the NSPIRE system to enforce the regulatory guidelines. REAC previously indicated that new IT funding is needed to make the system modifications but had not provided information about whether additional funding has been allocated. The final action target date was revised from May 31, 2024, to September 30, 2025.
Analysis
To fully address this recommendation, HUD must provide evidence demonstrating that it has implemented control activities that ensure public housing properties are inspected within the required timeframes.
Implementation of this recommendation will result in HUD accurately tracking the dates on which public housing properties should be inspected and that they are timely completed. Due to the uncertainty of when software changes to NSPIRE can take place to enforce the timing of inspections, REAC cannot enforce the requirements of inspection timing.
2023-LA-0004 | March 29, 2023
Opportunities Exist to Enhance Oversight of the Foster Youth to Independence Initiative to Improve Program Effectiveness
Public and Indian Housing
- Status2023-LA-0004-001-AOpenClosed
Develop and implement a plan to assist PHAs in improving voucher utilization, including providing additional guidance to PHAs to improve coordination between PHAs and PCWAs to improve voucher utilization and limit barriers to leasing.
- Status2023-LA-0004-001-BOpenClosed
Require PHAs to document that they informed FYI participants at program entry of their eligibility for supportive services and the availability of those services for the duration of the program.
- Status2023-LA-0004-001-COpenClosed
For each youth referred, require PHAs to obtain PCWA certification that the PCWA will provide or secure access to supportive services.
- Status2023-LA-0004-001-DOpenClosed
Include FYI in its voucher risk assessment and develop and implement monitoring policies, procedures, and controls.
- Status2023-LA-0004-001-EOpenClosed
Establish and implement methods to regularly assess the effectiveness of the program in preventing and ending youth homelessness and improving participants’ self-sufficiency, which could include performance metrics and periodic studies performed by the Office of Policy Development and Research (PD&R).
2023-CH-1001 | March 22, 2023
The Philadelphia Housing Authority Needs To Improve Oversight Of Lead-Based Paint In Its Public Housing
Public and Indian Housing
- Status2023-CH-1001-001-AOpenClosed
We recommend that the Director of the Philadelphia Office of Public Housing require the Authority to establish and implement procedures and controls to ensure that lead-based paint visual assessments are performed within the required timeframe.
- Status2023-CH-1001-001-BOpenClosed
We recommend that the Director of the Philadelphia Office of Public Housing require the Authority to implement adequate procedures and controls to ensure that lead-based paint hazard reduction work is performed within the required timeframe and that all identified hazards are abated or treated with interim controls.
- Status2023-CH-1001-001-COpenClosed
We recommend that the Director of the Philadelphia Office of Public Housing require the Authority to maintain lead-based paint documentation for its properties in a manner that it is readily available for review by HUD and the Authority’s tenants if requested.
- Status2023-CH-1001-001-DOpenClosed
We recommend that the Director of the Philadelphia Office of Public Housing require the Authority to perform a search for historical lead based paint documentation and if any documents are found, compare the results from the historical documents with the results of the recent testing to identify any potential issues or inconsistencies and maintain all lead-based paint documentation related to the Authority’s properties according to HUD’s requirements.
- Status2023-CH-1001-001-EOpenClosed
We recommend that the Director of the Philadelphia Office of Public Housing require the Authority to Implement adequate procedures and controls to ensure that accurate lead disclosures are provided to current and prospective tenants.
- Status2023-CH-1001-001-FOpenClosed
We recommend that the Director of the Philadelphia Office of Public Housing require the Authority to implement adequate controls to ensure that contracted inspectors’ deliverables comply with HUD’s and EPA’s requirements.
- Status2023-CH-1001-001-GOpenClosed
We also recommend that the Director of the Philadelphia Office of Public Housing work in conjunction with HUD’s Office of Lead Hazard Control and Healthy Homes to provide training to the Authority’s staff involved with managing lead-based paint and technical assistance in developing and implementing new procedures and controls.
- Status2023-CH-1001-001-HOpenClosed
We also recommend that the Director of the Philadelphia Office of Public Housing work in conjunction with HUD’s Office of Lead Hazard Control and Healthy Homes to assess the quality of the lead-based paint inspections and risk assessments performed by the Authority’s contractors to determine whether they are sufficient to fulfill HUD’s requirements.
2023-CH-0002 | March 06, 2023
HUD Could Improve Its Process for Evaluating the Performance of Public Housing Agencies’ Housing Choice Voucher Programs
Public and Indian Housing
- Status2023-CH-0002-001-AOpenClosed
We recommend that the Deputy Assistant Secretary for Public Housing and Voucher Programs enhance SEMAP or develop a new performance measurement process that would identify PHAs with underperforming HCV Programs, which should include an assessment of PHAs’ ability to maximize assistance to house families.
- Status2023-CH-0002-001-BOpenClosed
We recommend that the Deputy Assistant Secretary for Field Operations Provide additional training and guidance to field office program staff on SEMAP scoring, rating, and verification procedures, including confirmatory reviews, quality control reviews, and adjustments to the SEMAP process.
- Status2023-CH-0002-001-COpenClosed
We recommend that the Deputy Assistant Secretary for Field Operations provide training and guidance to field office program staff on SEMAP scoring, rating, and verification procedures, including confirmatory reviews, quality control reviews, and adjustments, as appropriate, for the revised SEMAP process.
2021-OE-0011b | February 28, 2023
Improvements are Needed to the U.S. Department of Housing and Urban Development's Processes for Monitoring Elevated Blood Lead Levels and Lead-Based Paint Hazards in Public Housing
Public and Indian Housing
- Status2021-OE-0011b-02OpenClosed
Create a plan and timeline that outlines OFO’s proposal to make necessary improvements to the EBLL tracker, such as moving it to a different platform.
- Status2021-OE-0011b-03OpenClosed
Provide field office staff access to historical data in the EBLL tracker to be readily available as needed, with adequate protection of PII.